2022 Expedition - Schedule for production ?

Disclaimer: Links on this page pointing to Amazon, eBay and other sites may include affiliate code. If you click them and make a purchase, we may earn a small commission.

radi8md

Member
Joined
Apr 28, 2022
Posts
7
Reaction score
4
Location
FL
Ordered in early Feb, Max Plat, nothing.

I stupidly passed on a Max Plat that hit a dealer lot a month+ ago because I want the 2nd row bench. Now I'm realizing this was a mistake.

I will pivot and trim-down into a limited (have deposits on 2, one "in production" 4/4 the other marked as "shipped" but no date under that so not sure how accurate that status is -- which one gets in first wins) as the platinum is not likely to ever be built and removal of the massaging seats is a deal breaker for me with respect to the $-premium over the limited.
 

22stealthexpo

Member
Joined
Feb 22, 2022
Posts
8
Reaction score
3
Location
PA
Ordered 2/19, still nothing. Limited 304A with HD trailer, CCD w/sports tuning susp, 3.73 edls
 
Last edited:

Antonie

Member
Joined
Apr 20, 2022
Posts
14
Reaction score
4
Location
Texas
Not to suggest that you can believe what is published in the news..., this quote just released does give some indication of the magnitude of Ford's problem with half build vehicles. "As was the case throughout the auto industry, Ford's supply chain problems, such as a shortage of computer chips, limited the number of vehicles it could make and sell. In fact it had 53,000 vehicles at the end of the quarter that were mostly completed but await installation of components affected by the semiconductor supshortage”
 

Cadet7263

Well-Known Member
Joined
Feb 3, 2022
Posts
137
Reaction score
62
Location
Royal Palm Beach, FL
Not to suggest that you can believe what is published in the news..., this quote just released does give some indication of the magnitude of Ford's problem with half build vehicles. "As was the case throughout the auto industry, Ford's supply chain problems, such as a shortage of computer chips, limited the number of vehicles it could make and sell. In fact it had 53,000 vehicles at the end of the quarter that were mostly completed but await installation of components affected by the semiconductor supshortage”
That's because they are still producing vehicles on the line, and producing those completely and shipping them out. They are just leaving the ones in the offsite lots so they can keep saying they are shortages. Why would you keep producing more, if you have ones sitting offsite for months at a time. Makes absolutely no sense, but then again, what does in this country these days.
 

GTRedneck

Active Member
Joined
Dec 27, 2021
Posts
34
Reaction score
18
Location
Atlanta, GA
Can people please mention the trim the ordered when staring their order and production dates? Will add a lot of value for people to compare to. Thanks!
 

maxlim2022

Full Access Members
Joined
Nov 2, 2021
Posts
126
Reaction score
59
Location
Illinois
ordered Nov 3rd. Build date came in today for June 20th week. I ordered with rear entertainment system in addition to the 302 A package and CCD and autostart delete. The RES was likely the major hold up given how early the car was ordered. I have not removed any options, would be interesting to see what is comes with and without.
Also, under packages, I see special edition package discount, whatever that means
 