2023 Ordering Timeline Thread

Disclaimer: Links on this page pointing to Amazon, eBay and other sites may include affiliate code. If you click them and make a purchase, we may earn a small commission.

bstard2001

Member
Joined
Aug 6, 2022
Posts
14
Reaction score
10
Location
Long Island, NY
We placed an order on 1/13 for a Limited in Dark Matter Metallic w/Ebony interior, 304a, HD Towing Package and CCD w/Sport Tuned Suspension. Will keep you posted of the timeline
 

cosshog

Member
Joined
Dec 2, 2022
Posts
18
Reaction score
13
Location
Ohio
Well the wait is over Friday. I was given a delivery date of 2/20 (vehicle was built 1/22).
Talked to dealer couple hrs after that and was told it was shipped and would be there within 48hrs. My father was looking at broncos so i went with him, low and behold we were there when transporter dropped expedition off. Everything looked good, picking up Friday morning will post pics this weekend.

Ordered 10/10
Built. 01/22
Delivery 02/01
 

cosshog

Member
Joined
Dec 2, 2022
Posts
18
Reaction score
13
Location
Ohio
Brought her home today! What a great ride and the color is way better looking than i thought, i love how it changes in different light.
Regular Cab, Dark Matter Metallic, 301a, HD Tow, cargo mngt system.
 

Joshfitz711

New Member
Joined
Jan 1, 2023
Posts
4
Reaction score
2
Location
South Jersey
Ordered ‘23 STX: Oct 31

Tow package change: 11/15

Two 45 day emails later and I’m starting to lose a little patience.. have my eye on a 22 XLT max with 750 miles but waiting a little longer.
 

HandWBeaz15

Member
Joined
Nov 13, 2022
Posts
15
Reaction score
10
Location
Michigan
Non-Update on ours:

Order confirmed NOV 15, still not scheduled for production. Which is still on course for what dealer told us to expect it in April-May.
XLT, 202AHigh, TowPKG, twin panel moonroof.
 

jrscott

Active Member
Joined
Nov 10, 2011
Posts
44
Reaction score
24
Location
Ont Canada
Ordered in mid September and got it today. Platinum max with trailer tow and bench seat. Put on winter tire and rim package, I will run factory 22s in the summer
21DDEA3D-948A-4D82-9E75-EADBFFA85C79.jpeg487B9B89-A971-4548-9FB9-4DC917145039.jpeg0103F5FB-3933-4D65-AE9D-C4EB0738D84E.jpeg
 

HandWBeaz15

Member
Joined
Nov 13, 2022
Posts
15
Reaction score
10
Location
Michigan
Lo and behold about 3 hours after I made the last post we got an update from Ford.

Order confirmed: NOV 15
Scheduled for Production: Week of MAR 6 / VIN assigned / tracking site active

Little bit ahead of schedule for now.
 

Andy B

Full Access Members
Joined
Aug 25, 2016
Posts
247
Reaction score
109
Location
Redding, CT
Update:

Ordered 10/31/22
Got a build date of 2/26
Build date disappeared
Now I have a build date of 3/6 (whew!)

Limited Stealth Performance / Loaded.
 
Top